Water bomber
7,500 L of water or retardant, released in continuous flow to lay a retardant line, or in a burst effect for a full drop in under 1.2 seconds.
Loading the site…Technology serving territories and their populations
An ATR 72 converted into a multirole water bomber: rapid drop, cargo and medical evacuation.

Operational versatility
Built on the proven ATR 72 airframe, the KEPPLAIR 72 combines a next-generation drop system, the Kepplair Evolution Delivery System.
An ATR 72 converted into a multirole, multi-mission water bomber: dedicated wildfire suppression with rapid drops, cargo and freight transport, relief troop transport and medical evacuation, all on a single platform.
The KEPPLAIR 72's modularity keeps it in service year-round, well beyond fire season alone.
By the numbers
7,500 L
Water or retardant carried
< 1.2 s
For a full drop
2 to 6
Patients evacuated per flight
8.5 t
Freight in cargo configuration
The KEPPLAIR 72's modularity keeps it in service year-round, well beyond fire season alone.
7,500 L of water or retardant, released in continuous flow to lay a retardant line, or in a burst effect for a full drop in under 1.2 seconds.
Up to 8.5 tonnes of freight across 75 m³ of usable volume, for logistics or humanitarian support missions outside fire season.
Medical configuration for the safe transport of 2 to 6 casualties, with medical staff and equipment on board.
Rapid transport of rescue teams along with their equipment.

The technological heart of the Kepplair 72 lies in its innovative drop system, the KEDS (Kepplair Evolution Delivery System).
Modifications concentrated in the belly fairing (the aircraft's underside), preserving the integrity of the cargo hold.
Advanced engineering developed with IMFT (Institut de Mécanique des Fluides de Toulouse) to guarantee a precise, consistent ground footprint.
A technology patent ensures unmatched drop performance.
Developed with IMFT (Institut de Mécanique des Fluides de Toulouse) and Trotter Controls.
2021
Initial talks about converting an ATR 72 airframe, the starting point of the KEPPLAIR 72 project.
2022
Technical and regulatory validation of the conversion concept.
2024
Funding for the first development and certification phases.
2025 – 2026
Detailed design, systems integration and flight testing.
2027
Delivery of the first aircraft to partner operators.
2021
Initial talks about converting an ATR 72 airframe, the starting point of the KEPPLAIR 72 project.
2022
Technical and regulatory validation of the conversion concept.
2024
Funding for the first development and certification phases.
2025 – 2026
Detailed design, systems integration and flight testing.
2027
Delivery of the first aircraft to partner operators.